– Fairly priced.

Auction products.

Bid on Prisma for our current storage products.

Jemgum SY 25/26 – 0.3 TWh

Jemgum SY 25/26 – 0.3 TWh

Storage

Jemgum
(market area THE/GTS)

Allocation date

12/12/2024, 11:00–11:30 CET

Contract period

01/04/2025 – 01/04/2026

Allocation mode/Pricing

Pay-as-bid

Plattform

PRISMA

Capacity on offer

0.3 TWh

Structure (firm)***

63 / 42 days

Structure (firm + interr.)****

63 / 42 days

view more

Contact for Marketing Enquiries

Tel.: +49 561 99858-7174
Tel.: +49 561 99858-7178
E-mail: sales@sefe-storage.de

Bundle structure

Volume firmVolume interr.Injection firmInjection interr.Withdrawal firmWithdrawal interr.
77,500,000 kWh051,150 kWh/h077,500 kWh/h0

Price model

Storage feeFixed price
Variable injection fee0
Variable withdrawal fee0
Service fee0

Conditions

Renomination lead time connection point Jemgum I2 h
Renomination lead time connection point Oude St.1/2 h

Connection Points

Market AreaTSONameOffered Transport Capacity
THEGASCADE1BMAbFZKtemp (exit), UBK
TTFGTS301391FZK, UBK

Injection Curve

Flat injection curve applies.

Withdrawal Curve

Flat withdrawal curve applies.

Miscallaneous / Comments

Allocation of capacity a few minutes after closing.

The respective current filling level requirements have to be considered.

open PRISMA Capacity Platform

Additional capacities and services

Additional capacities

There is more for you. Short-term capacities from within-day to all year round. 

view more

Remit

Time is money. We take over your storage status report to the authorities.  

view more

*** min. time to fully inject/withdraw using firm rates with consideration of storage curves
**** min. time to fully inject/withdraw using firm and interruptible rates with consideration of storage curves