– Fairly priced.

Auction products.

Bid on Prisma for our current storage products.

Rehden SY 24/25 (4) – 2.5 TWh

Rehden SY 24/25 (4) – 2.5 TWh

Storage location

Rehden (market area THE)

Allocation date

29/11/2023, 11:00-11:30 CET

Contract period

01/04/2024 – 01/06/2025

Allocation mode/Pricing

Pay-as-bid

Plattform

PRISMA

Capacity on offer

2.5 TWh

Structure firm*

127 / 83 [days]

Structure interr.**

127 / 47 [days]

view more

Contact for Marketing Enquiries

Tel.: +49 561 99858-7174
Tel.: +49 561 99858-7178
E-mail: sales@sefe-storage.de

Bundle structure

 

Volume firm

Volume interr.

Injection firm

Injection interr.

Withdrawal firm

Withdrawal interr.

01/04/24–01/04/25

100,171,093 kWh

0

32,943 kWh/h

0

50,681 kWh/h

0

01/04/25–01/06/25

0

10,017,109 kWh

0

0

0

8,900 kWh/h

Price model

Storage feeFixed price
Variable injection fee

0 €/MWh

Variable withdrawal fee

0 €/MWh

Service fee

0 €

  

Technical limitations

Renomination lead time delivery point

2 h

Max technical lead times (IR/WR)

2/6 h

Min flowsee specification

Temperature-dependent injection
rate and withdrawal rate

see specification

Transport / Delivery Points

 

Name

TSO

Market Area

Point-ID entry/exit

Offered Transport Capacity

Delivery point

USP Rehden

GASCADE GmbH

THE

Sp. Rehden

bFZKtemp., DZK, UBK

Injection Curve

IC [%] = WGV [%] x (–1.436) + 180.104

Withdrawal Curve

Working gas level between 55.0348189415042 % and 20 %:
WC [%] = WGV [%] x 1.436 + 20.97

Working gas level lower than or equal to 20 %:
WC [%] = WGV [%] x 1.436 + 13.47

Miscallaneous / Comments

No curves apply to interruptible capacity

Allocation of capacity a few minutes after closing

The respective current legal filling level should be taken into consideration

open PRISMA Capacity Platform

*min. time to fully inject/withdraw using firm rates without consideration of storage curves

** min. time to fully inject/withdraw using firm and interruptible rates without consideration of storage curves