– Fairly priced.

Auction products.

Bid on Prisma for our current storage products.

Rehden SY 25/26 (1) – 5 TWh

Rehden SY 25/26 (1) – 5 TWh

Storage location

Rehden (market area THE)

Allocation date

16/01/2025, 11:00-11:30 CET

Contract period

01/04/2025 – 01/04/2026

Allocation mode/Pricing

Pay-as-bid

Plattform

PRISMA

Capacity on offer

5 TWh

Structure firm***

161 / 144 [days]

Structure interr.****

161 / 122 [days]

view more

Contact for Marketing Enquiries

Tel.: +49 561 99858-7174
Tel.: +49 561 99858-7178
E-mail: sales@sefe-storage.de

Bundle structure

Volume firmVolume interr.Injection firmInjection interr.Withdrawal firmWithdrawal interr.
111,690,770 kWh036,731 kWh/h056,510 kWh/h9,900 kWh/h

Price model

Storage feeFixed price
Variable injection fee0 €/MWh
Variable withdrawal fee0 €/MWh
Service fee0 €

Conditions

Renomination lead time delivery point2 h

Delivery Point

Market AreaTSONameOffered Capacity Products
THEGASCADE GmbHSpeicher RehdenbFZKtemp., DZK, UBK

Injection Curve

Working gas level between 55.7827298050139 % and 100 %:
IC [%] = WGV [%] x (–1.436) + 180.104

Withdrawal Curve

Working gas level between 55.0348189415042 % and 20 %:
WC [%] = WGV [%] x 1.436 + 20.97

Working gas level lower than or equal to 20 %:
WC [%] = WGV [%] x 1.436 + 13.47

Miscallaneous / Comments

Allocation of capacity a few minutes after closing

The respective current filling level requirements have to be considered

No curves apply to interruptible capacity

Regulatory filing requirements: 1 October 2025 = 80% / 1 November 2025 = 90% / 1 February 2026 = 30%

open PRISMA Capacity Platform

*** min. time to fully inject/withdraw using firm rates with consideration of storage curves
**** min. time to fully inject/withdraw using firm and interruptible rates with consideration of storage curves