– Our customers decide.

Storage products.

Here you will find all information about our product world.

Rehden-pack

Rehden-pack

Storage location

Rehden (market area THE)

Allocation date

01/06/2012 – 01/04/2020

Contract period

min. 1 year

Allocation mode / Pricing

First-come-first-served / fixed price

Platform

no longer available

Product type

bundle

Structure firm*

73 / 112 [days]

view more

Contact for Marketing Enquiries

Tel.: +49 561 99858-7174
Tel.: +49 561 99858-7178
E-mail: sales@sefe-storage.de

Bundle structure

Volume (firm)

Injection rate (firm)

withdrawal rate (firm)

17,500 kWh

6.5 kWh/h

10 kWh/h

Price model

To determine the storage tariff, the respective storage tariff is multiplied by the number of bundles or the capacity and, if applicable, multiplied by the factors listed below. 

Storage tariff 24/25117.29 €/bundle/year
 
Long-term factorsDepending on the term of the agreement the storage service fee is multiplied by the following long-term factors to determine the fee to be charged:
 
Booking periodFactor
≥ 24 months0.985
≥ 36 months0.970
≥ 48 months0.955
≥ 60 months0.940
≥ 72 months0.925

 

Price adjustment

The storage services fee is subject to an annual price adjustment, which is calculated according to the following formula:

 

In this formula the following terms mean: 

E=Applicable storage fee in €/year or €/month
E0=Applicable storage fee in €/year or €/month
I=Average annual value of the German Producer Price Index
I0=Base value for I; base year 2009 (2005 = 100)
L=Annual average value of the index of hourly rates in the German energy industry
L0=Base value for L; base year 2009 (2005 = 100)

 

Variable injection fee0 €/MWh
Variable withdrawal fee0 €/MWh
Service fee0 €

Transport / Delivery Points

 

Name

TSO

Market Area

Point-ID entry/exit

Offered Transport Capacity

Delivery point 1

Sp. Rehden

GASCADE Gastransport GmbH

THE

3070

bFZKtemp, DZK (entry), UBK 

Delivery point 2

Injection Curve

Withdrawal Curve

Technical limitations

Renomination lead time
delivery point 1

2 h

Renomination lead time
delivery point 2

Technical lead times

up to 2h for injection or up to 6h for withdrawal
 

Min. flow

1,680,000 kWh/h for injection and storage level < 31.8 TWh
3,920,000 kWh/h for injection and storage level ≥ 31.8 TWh
896,000 kWh/h for withdrawal
 

Miscallaneous

Injection from 01/11 to 01/04 and withdrawal from 01/04 to 01/10 on best effort basis
At outside temperature of > 30 °C (at Rehden) SEFE Storage has the right to reduce the injection rate by 15%
At outside temperature of ≥ 20 °C (at Diepholz), withdrawal only possible on best effort basis

Additional capacities and services

Additional capacities

There is more for you. Short-term capacities from within-day to all year round. 

view more

Remit

Time is money. We take over your storage status report to the authorities.  

view more

* min. time to withdraw/inject by using firm rates excluding storage curves